www.toledoblade.comClick here to subscribe!

Monday, 11/23/09

Temp: 47°
Humidity: 89%




Keyword search
QwikNav

Archive search

Last 30 days search

Search




Home »   Neighbors »   Neighbors - East » 


Click to Receive RSS Feeds!EmailPrint IndexHelp FacebookMySpaceDiggDel.icio.usFark

Article published Wednesday, October 28, 2009
It's nice going green

It's official. The LHS Alternate Learning and Career Center in Oregon has gone green.

The new $2 million facility at 40 South Wheeling St. was completed in 2008, but last week got its LEED (Leadership in Energy and Environmental Design) Silver Certification.

The distinction means the 11,700-square-foot building, which serves children with severe behavioral problems, has followed requirements laid out by the U.S. Green Building Council, which runs the LEED program, and has used a design and materials that are conducive to environmental and human health and energy efficiency.

The LHS building is only the second school building in Ohio to earn the LEED certification, according to Kent Buehrer, whose firm, the Buehrer Group Architecture and Engineering Inc. designed and oversaw the project.

The LEED program emphasizes the importance of reusing materials, something the LHS building did in a big way by including a barn dating to the 1860s.

The barn was moved from the city of Oregon's right-of-way on Wheeling to a 100-foot setback and serves as the school's cafeteria.

"It was going to have to be moved or destroyed," said Harry Blackmon, executive director of LHS Family and Youth Services, an affiliate of the Lutheran Home Society. "It was my idea that we move it and turn it and use as a cafeteria. It's an heirloom."

The old barn's trusses and boards are plainly visible inside, but they belie the energy saving upgrades. Mr. Buehrer said rigid insulation was installed on the roof deck, and the hanging industrial light fixtures have compact fluorescent bulbs. The barn, which is at the south end of the facility, also has light tubes extending to the roof that act as skylights.

The rest of the facility, which is new construction, is equipped with the latest energy-efficient heating plant and low-flow faucets and toilets, Mr. Buehrer said. The insulated windows have three panes.

As much as possible, materials came from within a 500-mile radius, as stipulated by the LEED program. "It takes energy to bring this to the job site," he said.


Permanent Link

 RECENT RELATED ARTICLES

Band to get bite of Big Apple | 11/17/2009
4 arrested on warrants at Oregon checkpoint | 11/15/2009
Big changes in Oregon leadership under way | 11/11/2009
Tree, marker honor community service in Oregon | 11/04/2009
Oregon administrator resigns for Mentor post | 11/02/2009
2 injured in crash near Pearson Park | 11/02/2009
Pastor related well with youths | 11/02/2009
Oregon mom says son given flu shot against orders | 10/29/2009
Civility marks Oregon mayoral forum | 10/28/2009
Oregon mayor hopefuls to square off in debate | 10/21/2009
Forecast has '10-'11 Oregon Schools budget in the black | 10/21/2009
Oregon mayor is best choice | 10/20/2009
Oregon schools to use gym, library to vaccinate students | 10/15/2009
Oregon mayor fires back at rival candidate | 10/14/2009
Grants take aim at cutting traffic accidents in Oregon, Lake Township | 10/14/2009

More related articles »




 
Copyright 2009 The Blade. By using this service, you accept the terms of our privacy statement and our visitor agreement. Please read them.
The Toledo Blade Company, 541 N. Superior St., Toledo, OH 43660 , (419) 724-6000
To contact a specific
department or an individual person, click here.
The Toledo Times ®